GTC 600/2013A&B Pipelines for Mega Reservoirs Corridor Main 1 (Packages A & B)

Material supply, construction, testing and commissioning of buried ductile iron water mains and fibre optic cable ducts within the Northern length of the Qatar National Utility Corridor from Umm Birka (PRPS-1) to Dukhan Road as follows: Package A: 61.5 km of 1600 mm & 0.7 km of 1200 mm dia. mains; Package B: 48 km of 1600 mm & 14 km of 1200 mm dia. mains.

Awarded to: M/s Leighton Contracting Qatar
Effective Date: 25th June 2014