Awarded Contracts

GTC 599/2013B Pipelines for Mega Reservoirs Corridor Main 2 (Package B)

Material supply, construction, testing and commissioning of buried water mains and fibre optic cable ducts within the Southern length of the Qatar National Utility Corridor from Abu Nakhla (PRPS-4) to connections to the existing mains from Ras Abu Fontas including: 2.9 km of 1600 mm, 38.2 km of 1400 mm & 42.5 km of 1200 mm dia. mains.

Awarded to: M/s China Harbour Engineering Co.
Effective Date: 25th June 2014


Note:
Kahramaa will not under any circumstances accept any liability for the accuracy of the details provided above nor for any event arising from the use or interpretation of the information.